PR | ItemName | Specification | Quantity | ReqDept | Budget | Remarks | BiddingDate |
8139 | Laparoscopic Hand Instruments | 1. Metzenbaum scissor 2. Dissecting and grafting forceps 3. Dissecting and grafting forceps (buckbill Jaws) 4.Grasping forceps 5. Rothenberg bowel grasper 6. suction & irrigating tube 7. Dnipolar high freq cord 8mm | | OR | 847,465.34 | OPEN | |
8060 | ELECTROSURGERY UNIT | ELECTROCAUTERY MACHINE | 1 | OR | 900,000.00 | OPEN | |
8055 | 10 TONNER AIRCON UNIT | DUCT TYPE NON-INVERTER R22 220V | 1 | FMD | 180,000.00 | OPEN | |
8027 | AIRCON 2.5HP SINGLE PHASE 220V PICU209 | | 1 | FMD | 120,000.00 | OPEN | |
8025 | OR instruments, Telescope, Obturators, High flow arthroscope | Telescope 30, 4mm , 18cm | 3 | OR | | OPEN | |
7985 | Radiant Warmer | Compact, Portable without crib | 4 | NSO NCC | 800,000.00 | OPEN | |
7984 | PULSE OXIMETER | TABLE TOP | 4 | NSO NCC | 600,000.00 | OPEN | |
7982 | FETAL MONITOR | FETAL MONITOR AND CARDIAC MONITOR (EDAN) | 1 | DR / LR | 250,000.00 | OPEN | |
7980 | Bubble CPAP | complete set | 2 | NSO NICU | 400,000.00 | OPEN | |
7979 | RADIANT WARMER | COMPACT PORTABLE WITHOUT CRIB | 6 | NICU | 1,200,000.00 | OPEN | |
7975 | FLEXIBLE NASAL ENDOSCOPE | | 1 | OR | 400,000.00 | OPEN | |
7973 | HEART LUNG MACHINE | | 1 | OR | 16,000,000.00 | OPEN | |
7961 | Therapeutic Hypothermia machine | | 1 | ICU | | OPEN | |
7896 | Smoke Evacuation | Construction | 1 Lot | FMD | | OPEN | |
7886 | ENDOSCOPY TOWER | COMPLETE SET | 1 | OR | | OPEN | |
7873 | AIRCON 5HP SUSPENDED SINGLE PHASE 220V (pcu3) | | 2 | FMD | 340,000.00 | OPEN | |
7767 | MRI COMPATIBLE VENTILLATOR | HAMILTON -MR1 | 1 | CARDIO-PULMO | 3,000,000.00 | OPEN | |
7758 | Radiology Information System | Patient Management,Scheduling, | 1 lot | Radiology | | OPEN | |
7673 | ECG Machine for Emergency Dept | GE MAC 550 color EKG machine with cart | 1 | ED | 121,500.00 | OPEN | |
7672 | Video laryngoscope | Storz C mac System, mounted, flex probe | 1 | ED | 247,212.00 | OPEN | |
7671 | Portable ultrasound | GE Vscan Air Handheld ultrasound | 1 | ED | 262,170.00 | OPEN | |
7670 | Patient Monitoring System | with remote capabilities | 5 | ED | 483,364.80 | OPEN | |
7655 | RENOVATION OF FOUNTAIN | FOUNTAIN RENOVATION NEAR LABORATORY | 1 LOT | WMHD | 200,000.00 | OPEN | |
7643 | REHABILITATION OF TMCI PUMP ROOM | | 1 LOT | FMD | | OPEN | |
7604 | UPS for MDF and IDF | MDF-14KVA and IDF 10KVA | 1 lot | IT | | OPEN | |
7382 | foundation of smart parking system | Construction | 1 lot | FMD | 2,000,000.00 | OPEN | |
7379 | Rhinolaryngoscope | Flexible Fiber optic laryngoscope | 1 | ENT | | OPEN | |
7288 | Roofing of Old Building | 1.) Mobilization - Delivery of Materials, Tools, Equipment, and Manpower on Project Site. - Temporary Facility provision. - Water (if necessary) and Electricity Provisions. 2.) Clearing of Roof Surfaces - Removal of debris and other obstructions to the jobsite - Relocation of roof mounted outdoor units to secured area to avoid HVAC downtime 3.) Removal of Existing Long Span Roofing 4.) Replacement of deteriorated trusses, web members, and purlins - Identify all rusted roof members for replacement - Install temporary tarpaulin cover on areas exposed to rain in preparation for wet weather conditions 5.) Installation of new Long Span Roof - Seamless, full-length, cut-to-size metal roof panel installation from eave to ridge with no chance for water or air intrusion 6.) Fastening Edges and Terminations - Installation of appropriate fasteners - Application of Sealant: Proper sealing of end laps will avoid water being driven up-slope or where lapped joints may experience periods of standing water or become submerged 7.) Installation Gutter - Sizes should comply in accordance with the materials specifications - Downspouts should be directly in line with floor drain 8.) Waterproofing and Slope to Drain Correction of slab - Application of waterproofing in all slab area - Add wall chamfer with waterproofing - Correct slope to drain by adding concrete topping 9.) Water leak testing - - Simulate rainfall by applying a controlled amount of water to that specific spot on the roof. Check the substructure below the roof for any manifestations of water leak. 10.) Project Handover - - - Submission of flood & Leak testing results Submission of Certificate of Completion Submission of Warranty Certificate | 1Lot | FMD | .00 | OPEN | 1900-01-01 |
7178 | DAAS IT project | Desktop as A Service | 1 Lot | | | OPEN | |
7131 | ECG Machine | | 1 | Cardio Pulmo Dept | 123,900.00 | OPEN | |
7059 | PATIENT MONITOR | FOR CARDIO PULMO | 3 | FMD | | OPEN | |
6777 | Re-topping and water proofing of townhall | CONSTRUCTION | 1 Lot | | .00 | CLOSE | 2024-07-05 |